Structure and movement
Electric scaffold planning brings together the work platform, its supporting frame or mast structure, the base and the power context. Different visible frame arrangements should be identified separately. A drawing or photograph of one arrangement does not provide dimensions or ratings for another.
Describe the work area, the requested platform positions and how materials and tools reach that area. Then trace equipment access, setup and storage. Keep work-point height, platform position and the equipment's stored dimensions separate in the brief.