Structure and movement
A single mast arrangement has one mast guiding the vertical platform path. Describe the mast, platform, base and support area as separate parts of the equipment; the width of one part does not describe the full setup footprint.
Plan the task in two stages: movement to the work position, then setup and vertical access at that position. Record folded access dimensions separately from the space around the raised platform. Doorways, overhead obstructions and the intended storage location belong in the same route sketch.