Goods movement between levels

Custom Hydraulic
Goods Lifts

Configured around your load, travel and site.

Custom hydraulic goods lifts are configured around the load, vertical travel, platform space and building layout. These guide rail references cover moving goods between building levels, not passenger lifts. Compare single-rail and double-rail references with the required landings and entrance direction before requesting a project quote.

Complete guide rail freight lift with silver columns and a red guarded platform in a three-quarter view
Complete equipment reference

01 / Overview

A freight route
between building levels

Guide rail freight lift configurations are project-specific and are prepared around the requested load, vertical travel, platform size, served levels, entrance direction, site conditions, and power context.

Compare the structural references below, then use the project-input checklist to describe the route at each landing.

Cargo task
What moves, its size, required load and how it enters the platform.
Vertical route
Travel, stop positions, floor levels and entrance direction at each landing.
Building interface
Platform space, available opening, pit, overhead and installation access.

02 / Applications

Define where the cargo route meets the building

These project contexts help organize an enquiry. The final arrangement remains specific to the cargo task, measured building interface and reviewed site conditions.

01

Goods transfer between defined levels

Map the cargo route between measured floor levels, including each stop position and the entrance direction at every landing.

02

Warehouse and production interfaces

Coordinate the platform, cargo and handling method with openings, work areas, traffic routes and available installation space.

03

Project-specific building integration

Bring the shaft or support area, pit, overhead, landing protection, installation access and site services into one review.

Load and lifting height

Compare guide rail freight lift configurations

These cargo lift and goods lift references pair the listed load and lifting heights with their rail and drive arrangement. Compare the configuration with your platform dimensions, landings and installation space.

Scroll sideways to view all technical columns. The listed heights are discrete configuration references.

Load, lifting height and drive configuration references
LoadLifting heightsRail arrangementCylinder diameterCylindersLeaf chainMotor power
500 kg3, 4, 5 mSingle rail; two 125H-steel sectionsΦ631LH10442.2 kW
500 kg6, 7, 8, 9 mSingle rail; two 125H-steel sectionsΦ701LH10443 kW
1000 kg3, 4, 5, 6, 7, 8 mSingle rail; two 125H-steel sectionsΦ701LH12343 kW
1000 kg9, 10 mSingle rail; two 125H-steel sectionsΦ801LH12343 kW
2000 kg3, 4, 5, 6, 7, 8, 9 mDouble rail; four 125H-steel sectionsΦ702LH12344 kW
3000 kg3, 4, 5, 6, 7, 8, 9 mDouble rail; four 125H-steel sectionsΦ802LH12344 kW
5000 kg3, 4, 5, 6, 7, 8, 9 mDouble rail; four 150H-steel sectionsΦ1002LH16345.5 kW

Height definitions. Lifting height describes the platform rise. Overhead clearance is the available space above the highest landing; total installation height describes the full installation envelope. Record these as separate measurements.

Platform and building interfaces. Keep platform length and width, each landing entrance, pit, overhead and installation access with the selected load and height. A reference row does not establish that every requested combination fits the site.

Reading the 2000 kg double-rail configuration reference

The guide rail freight lift configuration table includes a 2000 kg double-rail reference. Keep its listed fields together when discussing your goods-handling project. The entry identifies a technical reference; your requested platform, served levels and building measurements still need their own records.

Keep the listed fields with the reference

Scroll sideways to read the listed fields.

Listed fields for this configuration reference
FieldListed value
Load 2000 kg
Listed lifting heights 3, 4, 5, 6, 7, 8, 9 m
Rail arrangement Double rail; four 125H-steel sections
Cylinder diameter marking Φ70
Cylinder count 2
Chain designation LH1234
Motor power 4 kW

Use the individual lifting-height entries as listed. Record your requested vertical travel with its start and end points, unit and measurement source. A lifting-height entry and the building's available installation space are separate details.

Retain the rail-arrangement wording and cylinder marking when asking about this reference. Keep the chain designation and motor-power entry attached to the same row. Add the available site power supply to your enquiry so that the electrical requirements can be discussed for the proposed arrangement.

Describe the platform and each landing separately

Give the requested platform length and width their own labels. Record the goods dimensions and mass, including packaging or a carrier where relevant. Explain the proposed loading and unloading method at each level. Identify handling equipment separately and describe where it would be used.

For the building, list the served levels and mark the entrance direction at each one. Keep the opening, any pit, overhead space and available equipment space in separate entries. Identify each measurement as taken on site, from a drawing or estimated. If a dimension is still missing, attach the question to the relevant entrance or space.

Bring the reference and site notes into the same enquiry

Use the guide rail freight lift configuration table to retain the reference you are considering. The goods lift site measurement checklist provides a place to organize the site inputs.

Include the reference, a labelled site sketch and the open questions with your quotation request. State your destination and quantity where known. You can describe the goods-handling task before a final configuration is selected.

Discuss your goods lift requirements

03 / Structure review

Two reference configuration paths

Compare each structural path alongside the load and lifting-height references above. Platform dimensions, stops, entrances and building interfaces complete the project configuration.

Blue three-dimensional illustration of a complete single-rail guide rail freight lift structure
Single-rail structure illustration

01 / Reference configuration

Single-Rail Reference Configuration

Single-rail arrangement shown as a structure illustration. Use this reference to discuss the platform position and building interface.

Information to review

  • Cargo type, required load and cargo footprint
  • Vertical travel and stop positions
  • Platform dimensions and entrance direction
  • Available opening, pit and overhead space

The reference label does not determine suitability. The project inputs and reviewed arrangement do.

Include this preference in an enquiry
Complete gray and yellow guide rail freight lift structure shown beside other equipment
Guide rail equipment · structure view

02 / Reference configuration

Double-Rail Reference Configuration

Double-rail arrangement shown in a complete equipment view. Use this reference to discuss the platform, surrounding structure and landing entrances.

Information to review

  • Cargo type, required load and loading method
  • Vertical travel, floors and stop positions
  • Platform geometry and landing entrances
  • Building opening, pit, overhead and access limits

Final dimensions and equipment arrangement remain tied to the reviewed site and cargo requirements.

Include this preference in an enquiry

04 / Configuration map

Define the freight route before discussing a configuration

Bring the cargo, vertical route, platform request, landings, entrances and site information into one project brief. Mark any item that is still unknown so it remains an open question.

  1. 01

    Requested load

    State the requested load and describe the cargo, its largest footprint and how goods will enter and leave the platform.

  2. 02

    Vertical travel

    Provide the requested vertical travel between the lowest and highest served positions. Explain how the measurement was taken or mark it as not yet available.

  3. 03

    Platform size

    Give the requested platform length and width and the space available around the proposed platform area. Include a sketch when dimensions are easier to show than describe.

  4. 04

    Served levels

    List each level the freight route needs to serve and identify the planned stop position at every landing.

  5. 05

    Entrance direction

    For each served level, show where goods enter and leave. State whether the entrance positions are the same, opposite or adjacent when that information is known.

  6. 06

    Site and power context

    Describe the installation area, access limits and indoor or outdoor conditions, then record the available voltage and frequency. Add the destination and any known site constraints.

Ask a quick question

05 / Prepare the enquiry

Useful drawings and photographs

  • Building drawing or dimensioned sketch
  • Marked floor levels, stop positions and landing entrances
  • Photographs of the installation area and access route
  • Cargo dimensions and weight, where available
Start the project enquiry
01

Submit project information

Share the cargo task, site information, destination and the files already available.

02

Review the configuration

Organize the open inputs and review the structure against the project context.

03

Discuss drawings and quotation

Use the reviewed requirements as the basis for the drawing and quotation discussion.

04

Prepare project execution

Confirm the information needed for the next project stage before execution begins.

Purchase preparation

Compare the complete purchase scope

Use the same duty, quantity, destination and requested scope when comparing quotations.

Configuration and quote factors

  • Compare the same goods load, lifting start and end points, platform size, served levels and entrance directions.
  • Keep building openings, equipment space and the available power supply identifiable alongside that lifting task.
  • Separate the equipment proposal from the transport, building work, electrical work and installation services being requested.

Site and arrival preparation

  • Label each level, entrance and goods-transfer area on a sketch. Show platform size and travel separately from openings, any pit and overhead space.
  • Mark measurements as taken from the building, a drawing or an estimate. Include the route for bringing equipment to the installation area.
  • If drawings are not ready, begin with the goods-handling task and the measurements already known.

Supply and support comparison

  • Equipment and accessories: identify the proposed arrangement and each requested item.
  • Documents: list the drawings and instructions being discussed, their language and the arrangement they cover.
  • Delivery, installation and commissioning: name the responsible party and handover point for each task.
  • Support: keep any written warranty coverage, exclusions and parts arrangements with the proposal.

For each scope item, record whether it is included in the equipment offer, supplied separately, arranged by another party or still open. An open item is not an agreed inclusion or a customer obligation. Start the enquiry with the information already available and identify the open items.

07 / Buying questions

Guide rail freight lift planning FAQ

Use these answers to prepare an enquiry. The reviewed project information remains the basis for the equipment discussion.

01 What should I include in a goods lift or cargo lift enquiry?

Describe the cargo and required load, vertical travel, platform size, served levels and entrance direction. Add the site conditions, available power, destination and any building drawings.

02 How should I compare single-rail and double-rail references?

Read the load, lifting-height entries and rail arrangement together within each configuration row. Include your platform size, served levels and entrance directions when requesting a configuration review.

03 Can I request a quotation before choosing a configuration?

Yes. Describe the task and share the information already available. The single-rail or double-rail preference can be included in the project description without choosing a fixed configuration first.

04 Which travel and building measurements should I send?

Show the required vertical travel, each served level, the requested platform size and entrance direction on a sketch. Mark the available opening, pit and overhead space separately, and identify any measurements that still need checking.

05 Can the platform and landing entrances be planned around the project?

Include the required platform length and width and the entrance direction at each landing. These details are reviewed together with the cargo and building conditions.

06 Can I attach drawings and site photographs?

Yes. The quotation form accepts PDF, JPG and PNG files. You can attach up to three files, with a maximum size of 10 MB for each file.

09 / Project enquiry

Start with the cargo, site and destination

You do not need to choose between the reference configurations before sending the information already available.

Get a Quote

Equipment image

Get a Quote